Floor slab is going off well despite the weather. A level base has been prepared to the perimeter of the house for the scaffolding to go up in a few weeks.
With no sign of the rain stopping I gave the concrete the once over with the float. I am hoping that it will still be a reasonable finish when the surface water has gone.
All floors now concreted. Going to give it a little while to go off before going over with the float. Weather has been pretty grim all morning. Time to warm up and get a brew on.